Working House Fire Assisting Hockessin

 
By Deputy Chief Brandon Cole
November 27, 2026
 

On Friday evening just before 1745 hours, the Avondale Fire Company was alerted to assist Hockessin with a reported house on fire. Engine, Chief & Deputy responded on dispatch. Engine 23 arrived as the second due engine laying a supply line from Lancaster Pike and Wellington Way to supply Engine 19. The crews deployed a second hand line to the second floor of the residence. The primary hydrant had a water issue and water became a challenge. The building was evacuated by command due to the water supply issue. After being evacuated, crews assisted opening up the garage area of the structure before staging in manpower. Crews assisted Hockessin until 2300 hours before getting back in service. Tanker 23 also responded and offloaded 3500 gallons of water.

Avondale Fire Police closed Gap Newport Pike at Limestone Road for the duration of fire efforts.

Chief and Deputy 23 assisted in command roles on scene.

Special thank you to Christiana Lancaster 52 for the engine cover throughout the duration.

 
Units: Engine, Tanker, Chief, Deputy, Traffic
 
Mutual Aid: Hockessin